Categories Date

Crowchild Trail Project

Located in Calgary, the Crowchild Trail was built over the Bow River in 1966. Today it is an essential part of Calgary's transportation system, which sees up to 100,000 vehicles per day.  Extensive work was required to reinforce the bridge structure and widen it by adding additional lanes in both directions.

AGF Reinforcing supplied and installed more than 2000 MT of reinforcing steel.

The project, which began in 2017, presented a sizeable logistical challenge because the lanes were kept open in both directions from 5 a.m. to 9 p.m. To do so, temporary platforms were installed directly over the river, so that work could be done under the bridges during the day while vehicles continued to circulate.

Thanks to Garth Berg of the Calgary team, AGF Reinforcing Inc. was able to complete this project safely and securely.

We’re very proud to have been part of such an important project.

La autopista Crowchild Trail, situada en Calgary, fue construida sobre el río Bow en 1966. Hoy en día es un elemento esencial de la red de transporte de Calgary, por la cual pasan hasta 100 000 vehículos por día. Fue necesario realizar trabajos importantes para reforzar la estructura del puente y ampliarlo con vías adicionales en los dos sentidos de circulación.

AGF Reinforcing se ocupó del abastecimiento y de la instalación de más de 2000 t de acero de refuerzo.

El proyecto, que inició en el 2017, representó un gran desafío logístico, ya que las vías de circulación se mantuvieron abiertas en los dos sentidos de las 5:00 a. m. a las 9:00 p. m. Para hacerlo, se instalaron plataformas temporales directamente sobre el río, lo que permitió trabajar bajo los puentes durante el día, mientras que los vehículos continuaban circulando.

Gracias a Garth Berg del equipo de Calgary, AGF Reinforcing Inc realizó este proyecto correctamente y de manera segura.

Nos sentimos muy orgullosos de haber participado en un proyecto de esta envergadura.