At AGF Group’s subsidiary Babich UAE, we have made a video to show the complexity of our work. The project covered is the Dubai Metro in United Arab Emirates.

Up to 220 employees (at peak) from Babich UAE will provide 20,000 MT of rebar for this construction.

The main challenge relates to the complexity of design. For example, a 7 Ton segment Bar Bending Schedule (BBS) had 244 bar marks with 40% of the bar marks special “99” shape code. 

Few of the 3173 segments were typical.

All rebar intersections had to be tied 100% as per consultant requirements.

The complexity combined with working in temperatures reaching 50 degrees Celsius was a challenge which Babich UAE overcame.

En Babich UAE, filial de Grupo AGF, realizamos un video para mostrar la complejidad de nuestro trabajo. El proyecto cubierto es el Metro de Dubái en Emiratos Árabes Unidos.

Hasta 220 empleados (en horas punta) de Babich UAE fabricaron 20 000 t de barras de refuerzo para esta construcción.

El desafío principal era la complejidad del diseño. Por ejemplo, ciertas barras debían tener una forma muy especial. Solamente una parte de las barras tenía una forma más estándar. Todas las intersecciones de las barras de refuerzo también tenían que estar ligadas al 100%, de acuerdo con los requisitos del consultor.

La complejidad del trabajo y las temperaturas que alcanzaban 50 grados Celsius fueron un desafío que Babich UAE logró superar con éxito.